v1/containers/{containerId}/change-orders
Retrieves a list of all change orders in a specified project, including PCO (potential change orders), RFQ (requests for quote), SCO (supplier change orders), RCO (requests for change order), and OCO (owner change orders). The fields returned in the response vary according to the type of change order. Note that requests for change order (RCO) may be referred to as “change order requests” (COR) in some Construction Cloud contexts. These two terms are interchangeable.
Resource Information
Method and URI | GET https://developer.api.autodesk.com/cost/v1/containers/:containerId/change-orders |
Authentication Context | user context required |
Required OAuth Scopes | data:read |
Data Format | JSON |
Request
Headers
Authorization* string | Must be Bearer <token> , where <token> is obtained via a three-legged OAuth flow. |
region string | The region where the project data resides, to which this request is routed.
This header is optional because the request is automatically routed to a target region based on the project ID or container ID. Using the header, though, can save lookup time on each API call. For information about verifying the region the data resides in, see the Working with BIM 360 Services in Different Regions section on the API Basics page. Possible values: |
Request
URI Parameters
containerId string: UUID | The ID of the cost container for the project. Each project is assigned a container that stores all of the cost data for the project.
To find the container ID, see the Retrieve a Cost Container ID tutorial. In ACC projects, the container ID is the same as the project ID. To obtain a project ID, use GET projects. |
Response
HTTP Status Code Summary
200 OK | Success. |
400 Bad Request | The parameters are invalid. |
401 Unauthorized | The provided bearer token is invalid. |
403 Forbidden | Forbidden. The user or service represented by the bearer token does not have permission to perform this operation. |
404 Not Found | The resource or endpoint cannot be found. |
409 Conflict | The request could not be completed due to a conflict with the current state of the resource. |
429 Too Many Requests | Rate limit exceeded. Retry your request after a few minutes. |
500 Internal Server Error | An unexpected error occurred on the server. |
503 Service Unavailable | Service unavailable. |
Response
Body Structure (200)
id string: UUID | Unique auto-generated identifier of the change order type. |
name string | The name of the change order type. |
type string | The type of the change order type. |
actAs string | The status and rules of the change order. |
position int | Not relevant |
workflowType string | Not relevant |
createdAt datetime: ISO 8601 | The date and time that the item was created, in ISO 8601 format. |
updatedAt datetime: ISO 8601 | The date and time that the item was last updated, in ISO 8601 format. |
Example
Success.
Request
curl -v 'https://developer.api.autodesk.com/cost/v1/containers/e94b9bc8-1775-4d76-9b1d-c613e120ccff/change-orders' \
-H 'Authorization: Bearer AuIPTf4KYLTYGVnOHQ0cuolwCW2a'
Response
[
{
"id": "227bf080-9481-11e8-87fb-215990a8aeb3",
"name": "PCO",
"type": "pco",
"actAs": "rfq",
"position": 1,
"workflowType": "Budget",
"createdAt": "2019-01-06T01:24:22.678Z",
"updatedAt": "2019-09-05T01:00:12.989Z"
}
]