Request

Response

    Change Orders
    GET

    v1/containers/{containerId}/change-orders/{changeOrder}/{id}

    Retrieves the details of a change order specified by ID.

    Note that this endpoint is compatible with both BIM 360 and Forma projects.

    Resource Information

    Method and URI
    GET
    https://developer.api.autodesk.com/cost/v1/containers/:containerId/change-orders/:changeOrder/:id
    Authentication Context
    User context required
    Required OAuth Scopes
    data:read
    Data Format
    JSON

    Request

    Headers

    Authorization*
    string
    Must be Bearer <token>, where <token> is a three-legged access token obtained via an Authorization Code flow or a Secure Service Account (SSA) flow.

    The SSA flow is designed for headless server-to-server operations. While it functions like a two-legged flow (no user interaction), it is classified as three-legged because it preserves user context.

    region
    string
    Specifies the region where the project data resides.

    By default, the request is routed automatically. However, specifying the region can improve performance by avoiding lookup overhead.

    Possible values: country or region codes such as US or EMEA. For the full list of supported regions, see the Forma Regions page.

    To verify your project’s region, refer to the Working with BIM 360 Services in Different Regions section on the API Basics page.

    * Required

    Request

    URI Parameters

    containerId
    string: UUID
    The ID of the project (the container ID is the same as the project ID). To obtain the project ID, see GET projects.
    changeOrder
    enum:string
    The type of change order. Possible values are pco (Potential Change Order), rfq (Request for Quote), rco (Request for Change Order), oco (Owner Change Order), and sco (Subcontractor Change Order).
    id
    string: UUID
    The change order’s ID.

    Request

    Query String Parameters

    include
    array: string
    Include nested resources in the response. For example, include=costItems will return the related cost items with the change order. include=attributes will return custom attributes which represents the “properties” in the response. Possible values: costItems, costItems[changeOrders], attributes, comments.

    Response

    HTTP Status Code Summary

    200
    OK
    Success.
    400
    Bad Request
    The parameters are invalid.
    401
    Unauthorized
    The provided bearer token is invalid.
    403
    Forbidden
    Forbidden. The user or service represented by the bearer token does not have permission to perform this operation.
    404
    Not Found
    The resource or endpoint cannot be found.
    409
    Conflict
    The request could not be completed due to a conflict with the current state of the resource.
    429
    Too Many Requests
    Rate limit exceeded. Retry your request after a few minutes.
    500
    Internal Server Error
    An unexpected error occurred on the server.
    503
    Service Unavailable
    Service unavailable.

    Response

    Body Structure (200)

    Expand all
    id
    string: UUID
    Unique identifier of a change order, auto generated.
    number
    string
    System-generated sequential number.

    Max length: 255

    splitNumber
    object
    Not relevant
    prefix
    string
    Not relevant
    number
    string
    Not relevant
    postfix
    string
    Not relevant
    isFreeModify
    boolean
    Not relevant
    name
    string
    The name of the Change Order

    Max length: 1024

    description
    string
    The detail description of the Change Order.

    Max length: 2048

    type
    string,null
    The type of the change order. It is customizable by the project admin.
    scope
    enum:string
    The scope of the change order. Possible values: out, in, tbd , budgetOnly, contingency.
    creatorId
    string
    The ID of the change order’s creator, a project user managed by BIM 360 Admin.
    ownerId
    string
    The ID of the change order’s owner, a project user managed by BIM 360 Admin.
    changedBy
    string
    The ID of the person who lastly changed the change order, a project user managed by BIM 360 Admin.
    markupFormulaId
    string
    Not relevant
    appliedBy
    string,null
    Not relevant
    appliedAt
    string,null
    Not relevant
    budgetStatus
    string,null
    The budget status of the PCO, RCO or OCO: Possible PCO statuses: [draft, open, submitted, accepted, approved, revising, executed, rejected, void]. Possible RCO statuses: [draft, open, submitted, revising, accepted, approved, executed, rejected]. Possible OCO statuses: [draft, open, inReview, submitted, revising, approved, executed, rejected]. Empty for an RFQ or SCO. The status of the change order should not be updated directly, but set by an action working on the change order.
    costStatus
    string,null
    The cost status of the PCO, RFQ, or SCO: Possible PCO statuses: [draft, open, pricing, proposed, accepted, approved, executed, revising, rejected, void]. Possible RFQ statuses: [draft, open, pricing, proposed, accepted, revising, rejected]. Possible SCO statuses: [draft, open, inReview, sent, executed]. Empty for an RCO or OCO. The status of the change order should not be updated directly, but set by an action working on the change order.
    estimated
    number,string,null
    Rough estimate of this change order without a quotation.
    proposed
    number,string,null
    The quoted cost of the change order.
    submitted
    number,string,null
    The amount sent to the owner for approval.
    approved
    number,string,null
    The amount approved by the owner.
    committed
    number,string,null
    The amount committed to the supplier.
    quantity
    number,null
    Not relevant
    unit
    string
    Not relevant
    scopeOfWork
    string
    The scope of work of the change order. Tiptap formatted rich text (https://tiptap.dev/introduction/).
    scheduleChange
    number,null
    The schedule change of the change order.
    proposedRevisedCompletionDate
    string,null
    The proposed revised completion date of the change order.
    note
    string
    The note to the change order. Tiptap formatted rich text (https://tiptap.dev/introduction/).
    sourceId
    string,null
    The ID of the source of the RFQ, ususally the PCO ID.
    externalId
    string
    The identifier assigned to an item in its original external ERP system. Use this ID to track and look up data within the integrated system. Note that this value comes from the item’s ID in the external system.

    Max length: 255

    externalSystem
    string
    The name of the external ERP system integrated with Cost Management. Use this name to identify and search for data within the integrated system.

    Max length: 255

    externalMessage
    string
    A message generated by the external ERP system that explains the sync status of the integration. For example, common values include success or fail to indicate the result of the integration operation.

    Max length: 255

    lastSyncTime
    datetime: ISO 8601
    The date and time when the item was last synchronized with the external ERP system. This value is updated by the external system and is in ISO 8601 format.
    integrationState
    string,null
    The state of the item during the integration with the external ERP system (such as SignNow). An item can be a budget, contract, main contract, main contract item, cost item, expense, expense item, change order, or schedule of value. For more details, see Integrate with External System tutorial. Possible values:

    locked: the item is currently locked within the ERP system, preventing modifications until unlocked. To unlock and modify the item, use the relevant PATCH endpoint to set integrationState to null. For example, for a budget, call PATCH budgets. For a contract, call PATCH contracts. For more details, see the Help documentation.

    integrated: the item has been successfully added to the ERP system.

    failed: the item encountered an error during the integration process and was not successfully added to the ERP system. For example, if a user tries to integrate contracts from an ERP system and the updates fail, the integrationState can be set to failed. Retry the sync process or analyze the issue if it continues to fail.

    null: The item has not been integrated with the ERP system. This is default value.

    For more information regarding integrations within the Cost Management system, see Integrations in Cost Management.

    integrationStateChangedAt
    string,null
    The date and time that the item’s integration status was last changed.
    integrationStateChangedBy
    string,null
    The user who last changed the integration status. This is the ID of a user managed by the BIM 360/Forma Admin.
    createdAt
    datetime: ISO 8601
    The date and time that the item was created, in ISO 8601 format.
    updatedAt
    datetime: ISO 8601
    The date and time that the item was last updated, in ISO 8601 format.
    properties
    array: object
    The custom attributes of the change order.
    name
    string
    Name of the custom attribute. Inherited from the custom attribute definition.
    builtIn
    boolean
    A flag to indicate whether this is a pre-defined attribute or not. Inherited from the custom attribute definition.
    position
    number
    The order of the custom attribute displayed in the BIM 360 Cost Management. Inherited from the custom attribute definition.
    propertyDefinitionId
    string: UUID
    The ID of the custom attribute definition. This is the ID from /properties.
    type
    string
    The type of the custom attribute. Inherited from the custom attribute definition.
    value
    string,array,null,number,boolean
    The assigned value for this custom attribute instance. For multi_option attributes, this is an array of selected choice values; for all other types, it’s a single value matching the definition’s type. Can be null if the attribute is not set.
    costItems
    array: object
    The cost items in the change order.
    id
    string
    The system ID of the cost item.
    includeMarkup
    boolean,null
    Used to indicate whether the cost items amounts estimated, proposed, submitted, approved, include the markups.
    variableMarkupFormulaItems
    array: object
    The variables when apply markup formula.
    id
    string
    The id of the markup formula item.
    amount
    number,string,null
    The amount of the markup formula item.
    companyId
    string,null
    The BIM360/Forma ID of the company. For RFQ & SCO it’s the supplier company. For OCO and OCO it’s the owner company. For PCO, when PCO acts as RFQ it’s the supplier company, when PCO asts as RCO it’s the owner company, otherwise it’s empty.
    companyUid
    string,null
    The unique ID (UUID) of the company in this hub. Detailed company information can be retrieved using this UUID by calling GET companies/:company_id in the response.
    architectCompanyId
    string,null
    The BIM360/Forma ID of the architecture firm.
    architectCompanyUid
    string,null
    The unique ID (UUID) of the company in this hub. Detailed company information can be retrieved using this UUID by calling GET companies/:company_id in the response.
    architectContactId
    string,null
    The BIM360/Forma ID of the primary contact at the architecture firm.
    additionalCollaborators
    array: object
    The additional collaborator company and contacts.
    companyId
    string
    The BIM360/Forma ID of the firm.
    companyUid
    string,null
    The unique ID (UUID) of the company in this hub. Detailed company information can be retrieved using this UUID by calling GET companies/:company_id in the response.
    contactIds
    array: string
    The BIM360/Forma user ID of the contacts in the firm.
    contactId
    string,null
    Not relevant
    contacts
    array: string
    Not relevant
    sourceType
    string,null
    The type of entity from which the change order is created (e.g., RFI, Issue).
    comments
    array: object
    The list of comments associated with the change order.
    createdAt
    string
    The date and time when the comment was created, in ISO 8601 format.
    content
    string
    The text content of the comment.
    creatorId
    string
    The BIM 360/Forma user ID of the comment’s author. For details about the author, see GET users.

    Example

    Success.

    Request

    curl -v 'https://developer.api.autodesk.com/cost/v1/containers/e94b9bc8-1775-4d76-9b1d-c613e120ccff/change-orders/pco/18d97ae0-9484-11e8-a7ec-7ddae203e404?include=include=costItems,attributes,comments' \
      -H 'Authorization: Bearer AuIPTf4KYLTYGVnOHQ0cuolwCW2a'
    

    Response

    {
      "id": "97363960-9483-11e8-a7ec-7ddae203e404",
      "number": 1,
      "splitNumber": {
        "prefix": "INT-",
        "number": 1,
        "postfix": "-XYZ",
        "isFreeModify": false
      },
      "name": "Additional Slab Openings",
      "description": "Something about additional Slab Openings",
      "type": "Purchase Order",
      "scope": "in",
      "creatorId": "CED9LVTLHNXV",
      "ownerId": "CED9LVTLHNXV",
      "changedBy": "CED9LVTLHNXV",
      "markupFormulaId": "27634250-96df-11e8-bdd8-e9d2381ecf45",
      "appliedBy": "CED9LVTLHNXV",
      "appliedAt": "",
      "budgetStatus": "open",
      "costStatus": "open",
      "estimated": "1000.0000",
      "proposed": "1000.0000",
      "submitted": "1000.0000",
      "approved": "1000.0000",
      "committed": "1000.0000",
      "quantity": 1,
      "unit": "ls",
      "scopeOfWork": "",
      "scheduleChange": 0,
      "proposedRevisedCompletionDate": "2021-01-01",
      "note": "",
      "sourceId": "",
      "externalId": "10010-99-AB",
      "externalSystem": "Sage300",
      "externalMessage": "Success.",
      "lastSyncTime": "2019-09-05T01:00:12.989Z",
      "integrationState": "locked",
      "integrationStateChangedAt": "2019-09-05T01:00:12.989Z",
      "integrationStateChangedBy": "CED9LVTLHNXV",
      "createdAt": "2019-01-06T01:24:22.678Z",
      "updatedAt": "2019-09-05T01:00:12.989Z",
      "properties": [
        {
          "name": "Source Type",
          "builtIn": true,
          "position": 0,
          "propertyDefinitionId": "fc4a7581-7838-11e8-a467-7de33c3af32d",
          "type": "options",
          "value": "RFI"
        }
      ],
      "costItems": [
        {
          "id": "9e027d30-9483-11e8-a7ec-7ddae203e404",
          "includeMarkup": "false"
        }
      ],
      "variableMarkupFormulaItems": [
        {
          "id": "9e027d30-9483-11e8-a7ec-7ddae203e404",
          "amount": "1000.0000"
        }
      ],
      "companyId": "GF8XKPKWM38E",
      "companyUid": "683904a0-47ce-4146-ac2d-a3840f00e0f4",
      "architectCompanyId": "GF8XKPKWM38E",
      "architectCompanyUid": "683904a0-47ce-4146-ac2d-a3840f00e0f4",
      "architectContactId": "CED9LVTLHNXV",
      "additionalCollaborators": [
        {
          "companyId": "GF8XKPKWM38E",
          "companyUid": "683904a0-47ce-4146-ac2d-a3840f00e0f4",
          "contactIds": [
            "CED9LVTLHNXV"
          ]
        }
      ],
      "contactId": "CED9LVTLHNXV",
      "contacts": [
        "CED9LVTLHNXV"
      ],
      "sourceType": "RFI",
      "comments": [
        {
          "createdAt": "2025-06-24T11:59:47.819Z",
          "content": "Please attach the revised structural drawings before approval.",
          "creatorId": "CED9LVTLHNXV"
        }
      ]
    }
    
    Show More