Change Orders
DELETE
v1/containers/{containerId}/change-orders/{changeOrder}/{id}
Delete an existing change order
Note that this endpoint is compatible with both BIM 360 and Forma projects.
Resource Information
| Method and URI | DELETE https://developer.api.autodesk.com/cost/v1/containers/:containerId/change-orders/:changeOrder/:id |
| Authentication Context | User context required |
| Required OAuth Scopes | data:write |
| Data Format | JSON |
Request
Headers
| Authorization* string | Must be Bearer <token>, where <token> is a three-legged access token obtained via an Authorization Code flow or a Secure Service Account (SSA) flow.
The SSA flow is designed for headless server-to-server operations. While it functions like a two-legged flow (no user interaction), it is classified as three-legged because it preserves user context. |
| region string | Specifies the region where the project data resides.
By default, the request is routed automatically. However, specifying the region can improve performance by avoiding lookup overhead. Possible values: country or region codes such as To verify your project’s region, refer to the Working with BIM 360 Services in Different Regions section on the API Basics page. |
* Required
Request
URI Parameters
| containerId string: UUID | The ID of the project (the container ID is the same as the project ID). To obtain the project ID, see GET projects. |
| changeOrder enum:string | The type of change order. Possible values are pco (Potential Change Order), rfq (Request for Quote), rco (Request for Change Order), oco (Owner Change Order), and sco (Subcontractor Change Order). |
| id array: string | The change order ID. |
Response
HTTP Status Code Summary
| 204 No Content | The resource has been deleted successfully. |
| 400 Bad Request | The parameters are invalid. |
| 401 Unauthorized | The provided bearer token is invalid. |
| 403 Forbidden | Forbidden. The user or service represented by the bearer token does not have permission to perform this operation. |
| 404 Not Found | The resource or endpoint cannot be found. |
| 409 Conflict | The request could not be completed due to a conflict with the current state of the resource. |
| 429 Too Many Requests | Rate limit exceeded. Retry your request after a few minutes. |
| 500 Internal Server Error | An unexpected error occurred on the server. |
| 503 Service Unavailable | Service unavailable. |
Response
Body Structure (204)
Response for 204 has no body.
Example
The resource has been deleted successfully.
Request
curl -v 'https://developer.api.autodesk.com/cost/v1/containers/e94b9bc8-1775-4d76-9b1d-c613e120ccff/change-orders/pco/:id' \
-X 'DELETE' \
-H 'Authorization: Bearer AuIPTf4KYLTYGVnOHQ0cuolwCW2a'
Response
204 No Content