    Change Orders
    GET

    v1/containers/{containerId}/change-orders

    Retrieves a list of all change orders in a specified project, including PCO (potential change orders), RFQ (requests for quote), SCO (supplier change orders), RCO (requests for change order), and OCO (owner change orders). The fields returned in the response vary according to the type of change order. Note that requests for change order (RCO) may be referred to as “change order requests” (COR) in some Construction Cloud contexts. These two terms are interchangeable.

    Note that this endpoint is compatible with both BIM 360 and Forma projects.

    Resource Information

    Method and URI
    GET
    https://developer.api.autodesk.com/cost/v1/containers/:containerId/change-orders
    Authentication Context
    User context required
    Required OAuth Scopes
    data:read
    Data Format
    JSON

    Request

    Headers

    Authorization*
    string
    Must be Bearer <token>, where <token> is a three-legged access token obtained via an Authorization Code flow or a Secure Service Account (SSA) flow.

    The SSA flow is designed for headless server-to-server operations. While it functions like a two-legged flow (no user interaction), it is classified as three-legged because it preserves user context.

    region
    string
    Specifies the region where the project data resides.

    By default, the request is routed automatically. However, specifying the region can improve performance by avoiding lookup overhead.

    Possible values: country or region codes such as US or EMEA. For the full list of supported regions, see the Forma Regions page.

    To verify your project’s region, refer to the Working with BIM 360 Services in Different Regions section on the API Basics page.

    * Required

    Request

    URI Parameters

    containerId
    string: UUID
    The ID of the project (the container ID is the same as the project ID). To obtain the project ID, see GET projects.

    Response

    HTTP Status Code Summary

    200
    OK
    Success.
    400
    Bad Request
    The parameters are invalid.
    401
    Unauthorized
    The provided bearer token is invalid.
    403
    Forbidden
    Forbidden. The user or service represented by the bearer token does not have permission to perform this operation.
    404
    Not Found
    The resource or endpoint cannot be found.
    409
    Conflict
    The request could not be completed due to a conflict with the current state of the resource.
    429
    Too Many Requests
    Rate limit exceeded. Retry your request after a few minutes.
    500
    Internal Server Error
    An unexpected error occurred on the server.
    503
    Service Unavailable
    Service unavailable.

    Response

    Body Structure (200)

    id
    string: UUID
    Unique auto-generated identifier of the change order type.
    name
    string
    The name of the change order type.
    type
    string
    The type of the change order type.
    actAs
    string
    The status and rules of the change order.
    position
    int
    Not relevant
    workflowType
    string
    Not relevant
    createdAt
    datetime: ISO 8601
    The date and time that the item was created, in ISO 8601 format.
    updatedAt
    datetime: ISO 8601
    The date and time that the item was last updated, in ISO 8601 format.

    Example

    Success.

    Request

    curl -v 'https://developer.api.autodesk.com/cost/v1/containers/e94b9bc8-1775-4d76-9b1d-c613e120ccff/change-orders' \
      -H 'Authorization: Bearer AuIPTf4KYLTYGVnOHQ0cuolwCW2a'
    

    Response

    [
      {
        "id": "227bf080-9481-11e8-87fb-215990a8aeb3",
        "name": "PCO",
        "type": "pco",
        "actAs": "rfq",
        "position": 1,
        "workflowType": "Budget",
        "createdAt": "2019-01-06T01:24:22.678Z",
        "updatedAt": "2019-09-05T01:00:12.989Z"
      }
    ]
    
    Show More