ProgressStepsManager.AppendStepBefore method
Inserts a new progress step immediately before the specified reference step. This is useful for adding pre-processing steps before existing workflow steps.
public void AppendStepBefore(Operation operationType, string referenceStepId, string stepId,
string title, string completionTitle)
| parameter | description |
|---|---|
| operationType | The type of operation to which the step should be added. |
| referenceStepId | The step ID of the existing step before which to insert the new step. |
| stepId | The unique identifier for the new progress step. Must be unique within the operation. |
| title | The display title for the progress step shown during execution. |
| completionTitle | The title displayed when the step is completed. |
Exceptions
| exception | condition |
|---|---|
| ArgumentException | Thrown when any string parameter is null or empty, when stepId already exists, or when referenceStepId is not found in the operation's step list. |
See Also
- enum Operation
- class ProgressStepsManager
- namespace Autodesk.DataExchange.ProgressManager