IProgressStep.SetProgress method
Sets the progress of the step as a percentage. Values outside 0-100 are clamped into range. Setting 100 also marks the step completed.
public void SetProgress(double percentage)
| parameter | description |
|---|---|
| percentage | The progress percentage from 0 to 100. |
See Also
- interface IProgressStep
- namespace Autodesk.DataExchange.ProgressManager.Interfaces